The Priory, Hungerford

We are delighted to announce that Oranmore Precast Ltd has begun supplying hollowcore for a Leadbitter project which entails the construction of 74 new affordable homes for the over-55s at The Priory in Hungerford. Oranmore Precast Ltd has been awarded the contract by CBS Precast Ltd to manufacture and supply 4600sq.m of 200mm and 150mm hollowcore. With its complex design and shape Oranmore Precast Ltd has been successful in providing accuracy and quality in manufacturing.

Project: The Priory, Hungerford
Client: CBS Precast Ltd
Type of structure: Residential
Precast Elements: Hollowcore
Start Date: November 2012


oranmore concrete precast hollowcore

Bath University

Oranmore Precast Ltd are delighted to announce that they are partnering CBS Precast Ltd in supplying another 400mm Hollowcore project in the UK. The project has approximately 8500sq.m of hollowcore which is due to commence Mid November for a duration of 16 weeks. The General Teaching Accommodation building, which will house two 350-space lecture theatres and other teaching rooms are being built by Main Contractor, Vinci Construction. Once completed, the 80,000 sq ft building will double the number of large scale lecture theatres on campus, allowing up to 2,000 students to use the building at any one time.

Project: Bath University
Client: CBS Precast Ltd
Type of structure: Educational
Precast Elements: Hollowcore
Start Date: November 2012

concrete oranmore precast concrete oranmore precast


oranmore concrete precast hollowcore

Oranmore Precast bring a Quality Finish to Bath University

Oranmore Precast Ltd have been selected by Vinci Construction in conjunction with CBS Precast to supply the precast floors for the new Chancellors’ Building which is to offer a dramatic new hub of learning and teaching on Bath University campus.

  • Project: Bath University
  • Client: CBS Precast Ltd c/o Vinci Construction
  • Precast Elements: 8000m2 of 400mm Deep Hollowcore Flooring
  • Start Date: November 2012

bath university construction

Oranmore Precast Ltd have been selected due to the soffit quality of their hollowcore precast which is to be left up to 70% exposed with a painted finish.

It includes facilities ranging from twin 350-seat lecture theatres to 30-seat group lecture rooms with state of the art audio visual provision.

The 8,000m2 building doubles the number of large scale lecture theatres on campus and up to 2,000 students can use the building at any one time.

The main entrance to the building faces the campus public transport arrivals area and the 350-seat refectory that forms part of the proposed new student accommodation building.