Products: Hollowcore, beam and block, stairs
Volume: 4,400m² plus staircases
Client: Kier
Kier was chosen to deliver two new blocks for The Saint John Henry Newman Catholic School in Stevenage.
The school project consisted of constructing two new buildings to accommodate teaching spaces, administration facilities, a new dining area and main hall.
Kier entrusted Oranmore Precast in supply, design, manufacture and installation of a range of our precast concrete products for the new school, including 3060m² of 200 deep Hollowcore slabs to the upper floors, approximately 1360m² of 225 deep Beam and Block to the ground floor as well as 2 cores of precast concrete staircases.